 |
Be Your Own Power Company
by David Morris
Rodale Press, 1982. Copyright Institute for Local Self-Reliance.
319 pages
Contents
- Introduction (308K .pdf)
- Chapter I: The Electric Revolution (1.4 MB .pdf)
Edison and the Rise of the Modern Utility
The New Deal Electrifies the Nation
The Pendulum Swings Back: Decentralized Power
- Chapter II: How the Electric System Works (1.4 MB .pdf)
The Modern Steam Plant
Case Study: Boston Edison
System Reliability
Utility Planning
- Chapter III: PURPA (2.3 MB .pdf)
Qualifying for PURPA
Utility Avoided Costs Data
Purchase Prices and Avoided Costs: A Brief History
Avoided Capacity Costs
As Available Capacity Credits
Excess Capacity
When Utility Purchases Are Not Required
All-Requirements Utilities and Wheeling
Wheeling
- Chapter IV: Interconnecting with the Grid (1 MB .pdf)
Protecting the Worker, the Customer and the Network
Generators, Inverters, Self-Excitation and Power Factors
- Chapter V: Getting the Best Deal (1.3 MB .pdf)
The Regulatory Process
The Negotiation Process
Force Majeure and Interruption of Power
Paying Interconnection Costs
- Chapter VI: Electric Generation Technologies (1.8 MB .pdf)
Wind Power
Hydropower
Photovoltaics
Cogeneration
- Chapter VII: Economics (1 MB .pdf)
A Simplified Guide to Energy Economics
Opportunity Costs
Case Study: Wind Power
Hydropower
Cogenerators
Photovoltaics
- Appendix 1: PURPA Sections 201 and 210 (230K .pdf)
- Appendix 2: Federal Energy Regulatory Commission Regulations Implementing PURPA Sections 201 and 210 (699K .pdf)
- Appendix 3: Electricity Generated by Oil (38K .pdf)
- Appendix 4: Twenty-five Most Expensive and Twenty Five Least Expensive Service Territories (56K .pdf)
- Appendix 5: Cost-of-Service Data for Selected Utilities (67K .pdf)
- Appendix 6: Source List: Equipment and Publications (178K .pdf)
- Appendix 7: States' Cogeneration Rate-Setting under PURPA (249K .pdf)
- Notes (152K .pdf)
- Bibliography (111 K .pdf)
|
 |
|